DSI Downhill Regenerative Overland Conveyor TB-30 for Los Filos, Goldcorp
Categories:
All industries,Mining
Material:
Gold Ore
Density:
144 t/cu-m | 90 PCF
Size:
50.8 mm | 2 in
Conveying rate:
1043 t/h | 1150 STPH
Conveying angle:
-4.1 deg
Belt width:
914 mm | 36 in
Belt speed:
2.3 m/s | 445 FPM
Lift:
-14300 mm | -47.8 ft
Length:
201000 mm | 665.5 ft
Top drive power:
N/A
Bottom drive power:
-44.7 kW | -60 HP